National Repository of Grey Literature 75 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Construction technology study stage rough construction object Barrack Court in Hodonin
Lačňák, Slavomír ; Štěrba, Martin (referee) ; Diaz, Yvetta (advisor)
This bachelor thesis focuse on the processing of selected parts of construction technological study for an object Kasárenský dvůr Hodonín. The bachelor contains the object engineering report, technological study of major technological stages of construction site, schedule and financial plan construction,the basic concept of the building operation, bills of quantities, technological report foundation construction and safety measures on the construction.
Polymer Systems Centre in Zlín - the Construction Techological Planning
Foltánek, Jan ; Doubek, Rostislav (referee) ; Motyčka, Vít (advisor)
The thesis deals with a technological project of Polymer System Centre in Zlín. It focuses on financial documentation and a time schedule of the construction. The technological project in detail focuses on implementation of a fabric of the Polymer System Centre. The thesis includes a technical report which suggests procedure of the construction. The technological documentation includes a plan of the construction site arrangement, a time schedule, a financial plan for the construction, a budget, a technological report suggesting partitions made of magnesium slabs, a control plan, a test plan and health and safety plan.
Preparation of realization of completion of clinical hematology, University Hospital Brno
Průcha, Aleš ; Doubek, Rostislav (referee) ; Kantová, Radka (advisor)
The aim of this diploma thesis is a solution of the extension of clinical hematology of the Faculty Hospital Brno. The thesis deals with the technological regulation for steel construction, coupled ceiling concrete slab with other topics including an inspection-check plan, a time schedule for carcass, time and financial schedule for structures and an item budget. In addition, this work includes the coordination site-layout of the construction with wider transport relations, mechanical assembly, the principles of the organization of site equipment and occupational safety and health risks. Finally this thesis contains several assessments for cranes, scheme of principles of fixing steel columns into structure, scheme of laying building envelope, LEED, site equipment financial assessment.
Construction technological project of administration building Gaceta in Prague
Jekielek, Marek ; Pražáková, Jana (referee) ; Diaz, Yvetta (advisor)
The objective of this thesis is the technological project of the structural construction of administrative building. It includes technological standards for reinforced concrete ceiling and for face layer of ventilated facade, the project of site construction, detailed structural, financial and time schedules of building object, controlling plans and test plans of the reinforced concrete skeleton and for face layer of ventilated facade from face brick, plan of main mechanical assemblies and costing of budget for structural.
Residential complex Troubsko - construction technology plan
Jurák, Ondřej ; Doubek, Rostislav (referee) ; Biely, Boris (advisor)
The aim of the diploma thesis is to elaborate a selected part of the construction technology plan for the Residential complex Troubsko. Specifically, it is focused on a pair of mirror-image apartment buildings marked SO 12.11 and SO 12.12. The building is located in the area of a former pond, which was backfilled in the past. The foundation strips are therefore placed on vibrated gravel pillars. The structure of the building is proposed as a traditional masonry building, the horizontal load-bearing structures consists of the cast-in-place reinforced concrete floor and the roof structure is designed as a flat roof. The thesis consists in a technical report pertaining to the construction technology plan, evaluation of transport routes, technological regulation for the cast-in-place reinforced concrete floor above 1PP and a time schedule for rough construction. Also elaborated are construction site equipment including a drawing and text part, a control and test plan, itemized budget with bill of quantities for rough construction, design of machine sets and work safety solutions are elaborated.
Residential complex Nový Žižkov - construction technological project
Gabriel, Jan ; Kopecký, Lukáš (referee) ; Biely, Boris (advisor)
The subject of this diploma thesis is the elaboration of a construction technological project for the construction of a residential complex Nový Žižkov in Poděbrady, where I will focus on the technological stage of the gross building of the main building SO-01 apartment building – section BI+BII (56 dwelling units). The supporting system of the building is composed of a combination of monolithic reinforced concrete structures and ceramic blocks. The foundation of a residential building is designed as a reinforced concrete basin with reinforcing ribs. The diploma thesis contains a text and attachment part.
Selected Parts of the Construction Technology Project for an Apartment Building in Kroměříž
Vyoralová, Tereza ; Hrdlička, Michal (referee) ; Mohapl, Martin (advisor)
In my master’s thesis, I deal with the preparation and implementation of selected parts of the construction technology project of an apartment building in Kroměříž. It is a non-basement building with 5 above-ground floors. The content of my master’s thesis is the preparation of a technical report for a construction and engineering project, a coordination situation with the solution of closer traffic relations, an assessment of the route of the tower crane, the object's time and financial plan, calculation according to THU, a study of the implementation of the main technological stages of the construction object, a construction site equipment project, which contains a technical report of the construction site equipment for rough construction and finishing works, as well as drawings for the given stages, a design of the main construction machines and mechanisms, a time schedule, an itemized budget for selected parts of SO 01.4, a technological regulation for the ETICS insulation system, a technological regulation for the installation of windows. Control and test plans were drawn up for both technological regulations. Furthermore, in my diploma thesis, there are catchment systems of flat roofs and the blow-door test.
Annes, Extension and Building Adjustment of the Building House Neumannova in Brno, Preparation and Realization of Buildings
Martincová, Michaela ; Patloka, Jiří (referee) ; Šlanhof, Jiří (advisor)
The thesis deals with the technological stage of the rough construction of the annex and the reconstruction of the apartment building on Neumannova Street in Brno-Pisárky. These are earthworks, rough substructure, rough construction, demolition work, and some of the finishing work. The diploma thesis deals with the design of the work process of the works, the design of the machine assemblies, the studies of the implementation of the main technological stages, the preparation of the budget item, the time schedule, the time and the financial plan of the object, the control and testing plan, the material assurance plan and the transport relations. Further, the design of the building facility is processed and a technical report of the building facility is made.
Multifunctional building - Houbalova - construction technology project
Ševčík, Jan ; Čech, Václav (referee) ; Henková, Svatava (advisor)
The subject of this thesis is the solution of building technology project poly-functional complex with a focus on execution of construction. Gross building is designed reinforced concrete skeleton combined with masonry. Technology will be developed Code for reinforced concrete monolithic frame and masonry. On the techno-logical stage it will be processed inspection and test plan and the balance of the major sources for the implementation of reinforced concrete structures 1.NP. The thesis is a proposal for construction site, which is complemented by a social facilities and offices. For an overall view of the construction of a multifunctional complex is processed time and financial plan, which will be further elaborated for building construction B. Availability of supply is verified by the design of routes. Like other task will be processed proposal formwork system for con-struction 1.NP Building B.
Implementation of production hall gross superstructure
Kvapil, Michal ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
Writing of this bachelor thesis was stimulated by the construction of a new production hall in my hometown. It had been a long time since a similar project was dealt with in this town, and therefore it aroused my interest. The bachelor thesis includes the description and technical documentation for the construction of the reinforced concrete building frame of the production hall of the M&T company in Dobruška. The aim of this thesis is to solve the method and potential problems of the construction. I focused on the ceiling of the administrative part of the building. Contrary to the original technical documentation, I suggested cheaper and more time-saving solution of the ceiling: using the prestressed hollow core slab SPIROLL instead of the reinforced concrete composite floor slab FILIGRAN and concreting of the ceiling. I suggested this solution on the basis of my personal experience with the implementation of various types of the ceiling, and the subsequent analysis of their advantages and disadvantages. My suggested solution of the ceiling caused the reduction of this stage’s costs by 13% and the time reduction by 71% of working time. The other aim of this thesis was to solve the problems with the excessive and oversize transportation of the reinforced concrete roof trusses. In the end, these transportation problems together with the financial aspects resulted in the revision of the original technical documentation. The investor decided for the less demanding solution of the construction and for the shorter span of the hall. As for the concreting machinery, I suggested to use the machines (mixer truck and mobile concrete pump) from the nearby concrete plant to reduce the total transportation costs. The main contribution of the bachelor thesis is acquaintance with the construction of the reinforced concrete building frame and with practical verification and comparison of two different solutions of one construction with respect to the financial and time investments

National Repository of Grey Literature : 75 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.